SEMI
  HOME
SEMI International Standards
Standards Locale: North America
Committee: EHS
Place of Meeting: Applied Materials in Santa Clara, California
Date of Meeting: 10/27/2011
Meeting End Date: 10/27/2011
Recording SEMI Standards Staff: Paul Trio
CER Posted to Web: 11/10/2011
Leadership Changes

Group
Previous Leader
New Leader
AMHS Safety Task Force disbanded.Alan Crockett (KLA-Tencor)
TC Chapter Structure Changes
None.

Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting.
Document #
Document Title
Committee Action
A&R Forms for Approved Ballots
4449C
Delayed Line Item Revision to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment. Line Item Revisions related to Work at Elevated Locations and to Removal of Burrs and Sharp Edges
Line Item 1
Provisions for work at elevated locationsFailed and returned to task force.4449C-LI1ProcedureReview FAILED.doc
Line Item 2
General safety precaution concerning the removal of burrs and sharp edgesPassed as balloted. Superclean4449C-LI2ProcedureReview.doc
4605E
Line Item Revisions to SEMI S22-1110, Safety Guideline for the Electrical Design of Semiconductor Manufacturing Equipment
Delayed Revisions on Multiple Topics
Line Item 1
Clarification of the creepage and clearance materialPassed as balloted. Superclean4605E-LI1ProcedureReview.doc
Line Item 2
Clarification of Ampacity TablesPassed with editorial changes.4605E-LI2ProcedureReview.doc
4774B
Line Item Revisions to SEMI S2-0310, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment. Delayed Revisions Related to Non-Ionizing Radiation
Line Item 1
Section 25 Reference and Appendix 4 Introductory Material CleanupPassed as balloted. Superclean4774B-LI1ProcedureReview.doc
Line Item 2
Revision of Static Magnetic Radiation Criteria in Appendix 4Passed with editorial changes.4774B-LI2ProcedureReview.doc


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities

#
Type
SC/TF/WG
Details
TBASNARFS2 Non-Ionizing Radiation TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions Related to Non-Ionizing Radiation

[To be submitted to the GCS for approval]
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF


Authorized Ballots

#
When
SC/TF/WG
Details
5000Cycle 1, 2012
(or C2-12)
S2 Interlock Reliability TFLine Item Revisions to SEMI S2-0310, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions Related to Interlock Reliability and Selection
5171Cycle 1, 2012
(or C2-12)
S25 Revision TFRevision to SEMI S25-0706, Safety Guideline for Hydrogen Peroxide Storage & Handling Systems
5009Cycle 2, 2012Ergonomics TFRevisions to SEMI S8-0308, Safety Guidelines for Ergonomics Engineering of Semiconductor Manufacturing Equipment (Revisions related to the SESC checklist)
TBACycle 2, 2012S2 Non-Ionizing Radiation TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions Related to Non-Ionizing Radiation

[To be submitted to the GCS for approval]
5170Cycle 2, 2012S2 3.3 Limitations TFLine Item Revisions to SEMI S2-0310, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Revisions Related to Section 3.3


SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
None.

Next Meeting
North America Standards Spring 2012 Meetings
April 2-5, 2012
The location of this meeting will be announced when finalized.

Proposed meting schedule:

Monday, April 2
- Fire Protection TF (9:00 AM to 10:00 AM)
- Section & Paragraph Symbols WG (10:00 AM to 11:00 AM)
- EHS Committee Process & Regs (11:00 AM to 12:00 Noon)
- S2 Ladders/Steps TF (1:00 PM to 2:30 PM)
- S2 Interlock Reliability (2:30 PM to 4:00 PM)
- S22 Electrical Safety TF (4:00 PM to 6:00 PM)

Tuesday, April 3
- S2 Chemical Exposure TF (9:00 AM to 10:00 AM)
- S2 3.3 Limitations TF (10:00 AM to 10:30 AM)
- S2 Non-Ionizing Radiation TF (10:30 AM to 12:00 Noon)
- S6 Revision TF (1:00 PM to 2:00 PM)
- S18 Support TF (2:00 PM to 3:00 PM)
- S25 Revision TF (3:00 PM to 4:30 PM)
[- I&CC Energy Saving Communications TF (3:00 PM to 6:00 PM), included for reference ]
- Ergonomics TF (4:30 PM to 6:00 PM)

Wednesday, April 4
- ICRC (9:00 AM to 11:00 AM)
- EHS Leaders Meeting (11:00 AM to 12:00 Noon)
- S23 Revision Japan TF (1:00 PM to 2:00 PM)
- S13 Revision Japan TF (2:00 PM to 3:00 PM)
- S3 Revision TF (3:00 PM to 4:00 PM)
- S2 to Machinery Directive TF (4:00 PM to 5:00 PM)
- MESSC (5:00 PM to 6:00 PM)

Thursday, April 5
- EHS Committee (9:00 AM to 6:00 PM)










Copyright © 2008 Semiconductor Equipment and Materials International (SEMI®).
All rights reserved.