SEMI
  HOME
SEMI International Standards
Standards Locale: North America
Committee: EHS
Place of Meeting: SEMI Headquarters in San Jose, California
Date of Meeting: 04/04/2013
Meeting End Date: 04/04/2013
Recording SEMI Standards Staff: Paul Trio
CER Posted to Web: 04/12/2013
Leadership Changes

Group
Previous Leader
New Leader
NA EHS CommitteeEric Sklar (Safety Guru)
FPD Safety System Liaison Task Force
This TF has been disbanded.
Carl Wong (AKT)
S2 3.3 Limitations Task Force
This TF has been disbanded.
Lauren Crane (KLA-Tencor)
Cliff Greenberg (Nikon)
S6 Revision Task ForceEric Sklar (Safety Guru)
S13 Support Task Force
This TF has been disbanded.
Eric Sklar (Safety Guru)
S22 Revision Task ForceEd Guild (---)
S25 Revision Support Task Force
This TF has been disbanded.
Eric Sklar (Safety Guru)
TC Chapter Structure Changes
None.

Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting.
Document #
Document Title
Committee Action
A&R Forms for Approved Ballots
* * * Cycle 1, 2013 Voting Period * * *
4316I
Line Item Revision to SEMI S2-0712a, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment, and SEMI S22-0712, Safety Guideline for the Electrical Design of Semiconductor Manufacturing Equipment4316I-LI1ProceduralReview FAILED.docx
Line Item 1
Fail-to-safe Equipment Control Systems RevisionFailed and returned to task force.
5521
Reapproval of SEMI S1-0708E, Safety Guideline for Equipment Safety LabelsFailed and returned to task force.5521ProceduralReview FAILED.docx
5522
Reapproval of SEMI S6-0707E, EHS Guideline for Exhaust Ventilation of Semiconductor Manufacturing EquipmentFailed and returned to task force.5522ProceduralReview FAILED.docx
* * * Cycle 2, 2013 Voting Period * * *
4683B
Line Item Revisions to SEMI S2-0712a, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment. Delayed Revisions Related to Chemical Exposure Criteria4683B-LI1ProceduralReview FAILED.docx
Line Item 1
Delayed Revisions Related to Chemical Exposure CriteriaFailed and returned to task force.
5000C
Line Item Revisions to SEMI S2-0712a, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment.
Addition of Related Information to S2: Selection of Interlock Reliability (In Delayed Effective Date Format)
5000CProceduralReview.docx
Line Item 1
Addition of Related Information to S2: Selection of Interlock Reliability (In Delayed Effective Date Format)Passed with editorial changes.
5357A
Line Item Revisions to SEMI S2-0712a, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment. Delayed Revisions Related to Optical Radiation5357AProceduralReview.docx
Line Item 2
Delayed Revisions Related to Optical RadiationPassed with editorial changes.


Ratification Ballot Results
None.

Activities Approved by the GCS between meetings of TC Chapter meeting
None.

Authorized Activities

#
Type
SC/TF/WG
Details
5590SNARFNA EHS Committee,
5-Year Review
Reapproval of SEMI S14-0309, Safety Guidelines for Fire Risk Assessment and Mitigation for Semiconductor Manufacturing Equipment
5591SNARFInternational Fire Protection TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment.
Delayed revisions related to fire code criteria
TBASNARFS2 Non-ionizing Radiation TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed revisions related to non-ionizing radiation
TBA – to be announced
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF

Authorized Ballots

#
When
SC/TF/WG
Details
5590Cycle 3, 2013NA EHS Committee,
5-Year Review
Reapproval of SEMI S14-0309, Safety Guidelines for Fire Risk Assessment and Mitigation for Semiconductor Manufacturing Equipment
4316JCycle 3, 2013
(or C4-13)
S22 TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment, and SEMI S22, Safety Guideline for the Electrical Design of Semiconductor Manufacturing Equipment
Revisions related to clarifying the FECS criteria of S2 and S22
TBACycle 3, 2013
(or C4-13)
S2 Non-ionizing Radiation TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed revisions related to non-ionizing radiation
4683CCycle 4, 2013S2 Chemical Exposure TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment
Delayed Revisions Related to Chemical Exposure
4449ECycle 4, 2013S2 Ladders & Steps TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment. Revisions related to stairs, ladders, platforms, and fall protection
5009BCycle 4, 2013Ergonomics TFDelayed Line Items Revisions to SEMI S8, Safety Guidelines for Ergonomics Engineering of Semiconductor Manufacturing Equipment
5591Cycle 4, 2013International Fire Protection TFLine Item Revisions to SEMI S2, Environmental, Health, and Safety Guideline for Semiconductor Manufacturing Equipment.
Delayed revisions related to fire code criteria
TBA – to be announced

SNARF(s) Granted a One-Year Extension
None.

SNARF(s) Cancelled
None.

Standard(s) to receive Inactive Status
None.

Special Announcements of the Committee (Workshops, Programs, etc.)
None.

Next Meeting
North America Standards Meetings at SEMICON West 2013
July 8-11, 2013
San Francisco Marriott Marquis Hotel
55 Fourth Street
San Francisco, California 94103

Monday, July 8
- S22 (Electrical Safety) TF (9:00 AM to 10:30 AM)
- S8 Ergonomics TF (10:30 AM to 12:00 Noon)
- S2 Non-Ionizing Radiation TF (1:00 PM to 2:00 PM)
- S2 Chemical Exposure TF (2:00 PM to 3:30 PM)
- S2 Ladders & Steps TF (3:30 PM to 5:00 PM)
- Seismic Protection Japan TF (5:00 PM to 6:00 PM)

Tuesday, July 9
- [ICRC (8:30 AM to 11:00 AM)]
- S10 Revision Europe TF (11:00 AM to 11:30 AM)
- S1 5-Year Review Discussion (11:30 AM to 12:00 Noon)
- Fail-Safe Fault-Tolerant TF (1:00 PM to 2:00 PM)

Wednesday, July 10
- S2 Machinery Directive Mapping TF (8:00 AM to 9:00 AM)
- MESSC (9:00 AM to 11:00 AM)
- Fire Protection TF (11:00 AM to 12:00 Noon)
- EHS Leadership Meeting (1:00 PM to 2:00 PM)
- S6 Revision TF (2:00 PM to 3:00 PM)
- S23 Revision Japan TF (5:30 PM to 6:30 PM)

Thursday, July 11
- EHS Committee (9:00 AM to 6:00 PM)

For more information about the NA Standards SEMICON West 2013 meetings, please visit: semi.org/standards









Copyright © 2008 Semiconductor Equipment and Materials International (SEMI®).
All rights reserved.