SEMI International Standards
Standards Locale: North America
Committee: Metrics
Place of Meeting: SEMI Headquarters in San Jose, CA
Date of Meeting: 04/03/2013
Meeting End Date: 04/03/2013
Recording SEMI Standards Staff: Michael Tran
CER Posted to Web: 04/17/2013
Leadership Changes
Group | Previous Leader | New Leader |
| Wait Time Waste TF |  | Lance Rist (Industry Consultant), co-leader |
TC Chapter Structure Changes
None.
Ballot Results
Passed ballots and line items will be submitted to the ISC Audit & Review Subcommittee for procedural review.
Failed ballots and line items were returned to the originating task forces for re-work and re-balloting.
Document # | Document Title | Committee Action | A&R Forms for Approved Ballots |
5472 | Revision to SEMI E43-1108, Recommended Practice for Electrostatic Measurements on Objects and Surfaces with title change to: Guide for Electrostatic Measurements on Objects and Surfaces | Passed as balloted. |  |
5525 | Reapproval of SEMI E150-1107, Guide for Equipment Training Best Practices | Failed committee review. |  |
5526 | Line Item Revisions to SEMI E165-0712, Guide for Comprehensive Equipment Training Systems when Dedicated Training Equipment is not Available |  |  |
Line Item 1 | Revisions to Paragraph 5.2.1 | Passed as balloted. Superclean. |  |
Line Item 2 | Revisions to Paragraph 5.2.2 | Passed as balloted.
Superclean. |  |
Ratification Ballot Results
None.
Activities Approved by the GCS between meetings of TC Chapter meeting
None.
Authorized Activities
Listing of all new TFOFs, SNARFs, and other activities approved by the committee.
# | Type | SC/TF/WG | Details |
5529 | SNARF | Wait Time Waste TF | New Standard: Specification for Measurement of Product Time in Semiconductor Manufacturing |
--- | SNARF | Equipment Training & Documentation TF | Revision to SEMI E149-0708, Guide for Equipment Supplier-Provided Documentation for the Acquisition and Use of Manufacturing Equipment
(Note: SNARF will be submitted to the Metrics GCS for approval after the meeting.) |
--- | SNARF | Equipment Training & Documentation TF | Revision to SEMI E150-1107, Guide for Equipment Training Best Practices
(Note: SNARF will be submitted to the Metrics GCS for approval after the meeting.) |
--- | SNARF | EMC TF | New Standard: Guide for Semiconductor Manufacturing Facilities Electromagnetic Compatibility (EMC)
(Note: SNARF will be submitted to the Metrics GCS for approval after the meeting.) |
Note: SNARFs and TFOFs are available for review on the SEMI Web site at:
http://downloads.semi.org/web/wstdsbal.nsf/TFOFSNARF
Authorized Ballots
Listing of documents approved by the committee for letter ballot.
# | When | SC/TF/WG | Details |
--- | Cycle 4- 2013 | Equipment Training & Documentation TF | Revision to SEMI E150-1107, Guide for Equipment Training Best Practices |
SNARF(s) Granted a One-Year Extension
None.
SNARF(s) Cancelled
None.
Standard(s) to receive Inactive Status
None.
Special Announcements of the Committee (Workshops, Programs, etc.)
None.
Next Meeting
The next N.A. Metrics standards meetings are scheduled in conjunction with SEMICON West 2013 at the San Francisco Marriott Marquis Hotel in San Francisco, California.
*Tentative Schedule*
Monday, July 8*
· EMC TF (3:00 PM – 5:00 PM)
Tuesday, July 9*
· Equipment Training and Documentation TF (9:00 AM - 12:00 PM Noon)
· ESD/ESC TF (3:00 PM – 5:00 PM)
Wednesday, July 10*
· Equipment RAMP Metrics TF (9:00 AM – 12:00 PM Noon)
· Wait Time Waste TF (1:00 PM – 3:00 PM)
· Metrics Committee (3:00 PM - 6:00 PM)
*All times are in PST. Times and dates are subject to change without notice.